CO-OPERATIVE BULK HANDLING
|
CBH Dehulling Plant - Forrestfield Subcontracting to a joint venture company established between Weston Milling and CBH for the dehulling and preparation of lupins for stockfeed, the plant incorporated a series of cleaning nd descaling processes followed by milling and outload to bulk storage. The entire installation had to be carried out to the high standards of a food grade processing plant which required the fabrication of stainless ducts and tubing for cable access to the various machines. Peak’s scope included the supply and installation of the MCC’s , power and control cabling, instruments, field equipment and cable supports to the various items of equipment situated over 6 levels of the purpose built process building. CBH Lake Grace-Rapid Rail outload and Storage Facility Upgrade Located at a major CBH terminal in the Wheatbelt, the site rail outload facility was upgraded to accommodate a 100% efficiency improvemnet in their grain handling operations. Peak were required to install all of the power, control and communications cabling including a fibre optic link between loading systems elements. The projects also included additions to the existing open bulkhead facilities with additional ground conveyors and stacker outloading facilities. CBH York-New storage and upgraded rail nload/outload facility This project involved a new bulk storage facility and grain handling for the new 330m fully enlosed grain storage shed including a new overhead shuttle conveyor fed from the inload conveying system. Included as part of the upgrade to the rail loading was a elevator conveyor and cross conveyors to move grain to the rail siding silos and outload facility.
|